Joseph H Eto
Publications
Viewing 25 of 272 publications
2010
, , , , , , , , , , , , and . Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation. 2010.
, , , and . "How to Estimate the Value of Service Reliability Improvements." IEEE Power and Energy Society General Meeting. Minneapolis, MN: IEEE, 2010. 5.
, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , and . "Defining a standard metric for electricity savings." Environmental Research Letters 5.1 (2010).
Google Scholar | DOI | BibTeX | Endnote tagged | RIS
2009
. National Electric Transmission Congestion Study (2009). Berkeley: LBNL, 2009.
, , , , and . Transmission Benefit Quantification, Cost Allocation and Cost Recovery. Berkeley: LBNL, 2009.
, , , , , , , , and . "Overview of the CERTS microgid laboratory test bed." Integration of Wide-Scale Renewable Resources into the Power Delivery System, CIGRE/IEEE PES Joint Symposium. Calgary, AB, Canada: IEEE, 2009.
, , , , , , , and . Demand Response Spinning Reserve Demonstration - Phase 2 Findings from the Summer of 2008. Berkeley: LBNL, 2009.
, , , , , and . "Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission." The Electricity Journal 2009.
2008
, , , and . Real-Time Grid Reliability Management (2008): PIER Final Project Report. Berkeley: LBNL, 2008.
, , , and . California ISO Phasor Application Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix D). Berkeley: LBNL, 2008.
, and . Real-Time Tools Survey Analysis and Recommendations, Final Report. Berkeley: The North American Electric Reliability Corporation , 2008.
, , and . Real Time Systems Operations 2006 - 2007. Berkeley: LBNL, 2008.
, , , , , , , , and . "Efficient and Reliable Reactive Power Supply and Consumption - Insights from an Integrated Program of Engineering and Economics Research." The Electricity Journal 2008: 70–81.
2007
, , , and . Real Time Grid Reliability Management 2005: PIER Final Project Report. Berkeley: LBNL, 2007.