Interconnection Cost Analysis in the PJM Territory
| Date Published |
01/2023
|
|---|---|
| Publication Type | Policy Brief
|
| Authors | |
|---|---|
| Abstract |
Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find:
Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs. |
| Notes |
A brief overview of this research can be viewed here. |
| Year of Publication |
2023
|
| Organizations | |
| Research Areas | |
| File(s) | |
| Download citation |