Interconnection Timelines and Costs for Distributed Energy Projects in the United States (2000-2025)

Date Published
06/2026
Publication Type
Report
Authors
Abstract

These slides summarize and explain empirical data on interconnection timelines and costs for distributed energy projects connected to U.S. utility distribution systems. The study explores how interconnection metrics vary across states, project sizes, technology types, and over time to indicate progress toward simple, fast, and affordable interconnection. Data encompasses 188 utilities in 24 states. Project types include biomass/biofuels, coal, hydropower, natural gas/oil, solar, storage, wind, hybrid, and other technologies.

Notes

A webinar discussing this research was held on May 27, 2026. The presentation slides can be viewed here

Year of Publication
2026