%0 Generic %A Joachim Seel %A Julie Mulvaney Kemp %A Joseph Rand %A Will Gorman %A Dev Millstein %A Ryan H Wiser %A Ari Weissfeld %A Nicholas DiSanti %A Kevin Porter %D 2023 %T Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory %8 04/2023 %X

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page.

We find:

Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs