%0 Generic %A Julie Mulvaney Kemp %A Joachim Seel %A Joseph Rand %A Dev Millstein %A Fredrich Kahrl %A Will Gorman %A Ryan H Wiser %A Will Cotton %A Kevin Porter %D 2023 %T Interconnection Cost Analysis in the NYISO Territory %8 03/2023 %X

Electric transmission system operators (ISOs, RTOs, and utilities) require large new generators and storage resources seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies from the New York Independent System Operator (NYISO), representing at least 43% of all new unique generation and storage resources requesting interconnection in NYISO from 2003 through 2019. Project-level cost summary data are available for download on this page.

We find:

Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs