%0 Generic
%K FIDVR
%K FIDVR-002
%D 2008
%T 2008 US DOE Workshop on the Role of Residential AC in Contributing to Fault-Induced Delayed Voltage Recovery (FIDVR)
%8 04/2008
%X
Workshop Objectives:
- To increase understanding within the electric utility and air conditioning manufacturing communities of the risk of blackouts that may be associated with the growing market penetration of residential air conditioning;
- To share recent utility industry experiences that provide the basis for this concern and the efforts that they are currently undertaking to address them;
- To present technical information on what is known about the underlying electrical phenomena, both from a macro or system level perspective, as well as from a micro or device level perspective;
- To review and discuss technical options, on both the supply and demand-side, to address these concerns, including their cost, timing, and relative efficacy, toward understanding the appropriate elements needed for a coordinated and balanced response