TY - JOUR AU - Will Gorman AU - Julie Mulvaney Kemp AU - Joseph Rand AU - Joachim Seel AU - Ryan H Wiser AU - Nick Manderlink AU - Fredrich Kahrl AU - Kevin Porter AU - Will Cotton AB -
Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.
BT - Joule DA - 12/2024 DO - 10.1016/j.joule.2024.11.008 N1 -An open-access version of this paper published in Joule can be downloaded here. A brief overview of this study can be found here.
For more information about our interconnection work, please visit our project page on interconnection costs or our project page on interconnection queues.
Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.
PB - Elsevier BV PY - 2024 EP - 101791 T2 - Joule TI - Grid connection barriers to renewable energy deployment in the United States UR - https://www.sciencedirect.com/science/article/pii/S2542435124005038 SN - 2542-4351 ER -