TY - SLIDE KW - FIDVR KW - FIDVR-002 AB -

The workshop seeks to bring together the power system and end-use manufacturing communities to review jointly what is now known about FIDVR and the related activities currently underway to ensure the reliability of the U.S. electric power system.

Session Five: Field Measurements
Gathering data at the distribution level to better understand the phenomena of FIDVR and load dynamics.

  1. Kyle Thomas, Dominion Virginia Power
  2. Richard Bravo, Southern California Edison
  3. John Undrill, Independent Consultant
BT - 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling DA - 09/2015 N2 -

The workshop seeks to bring together the power system and end-use manufacturing communities to review jointly what is now known about FIDVR and the related activities currently underway to ensure the reliability of the U.S. electric power system.

Session Five: Field Measurements
Gathering data at the distribution level to better understand the phenomena of FIDVR and load dynamics.

  1. Kyle Thomas, Dominion Virginia Power
  2. Richard Bravo, Southern California Edison
  3. John Undrill, Independent Consultant
PY - 2015 T2 - 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling T3 - 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling TI - Field Measurements ER -