TY - CPAPER AU - Naoya Motegi AU - Mary Ann Piette AU - Scott Wentworth AB -

As part of the High Performance Commercial Building Systems program, LBNL has been working with the City of Oakland to understand the ongoing performance of the Oakland Administration Buildings. The primary objective of this research is to understand the performance targets and ongoing performance of two buildings that were the subject of a new construction performance contract. Secondary objectives include examining the building performance information systems developed as part of the new construction performance contract and evaluating the role of the energy management and control system (EMCS) as a data acquisition tool to provide recommendations for future new construction projects. We examine the results of the performance contract in detail, and provide additional performance metrics that go beyond what was required in the performance contract. We found that the energy cost intensities (ECI) linked to the project ranged from $1.08/ft2 to $1.44/ft2. Changes in floor area, energy costs, rate schedules, and energy use complicate the evaluation of the performance because of the lack of tracking of underlying data and assumptions. Overall, Oakland has two large office buildings with relatively low-energy use (50 kBtu/ft2-yr site electricity and gas use). We compare this energy-use intensity with a number of related benchmarks. Additional end-use, HVAC performance, and diagnostics data are discussed.

BT - 2002 ACEEE Summer Study on Energy Efficiency in Buildings C2 - LBNL-50738 C3 -

80FJ52

C4 -

August 18-23, 2002

C5 -

CD

C6 -

Commercial Building Systems

C7 -

y

CY - Pacific Grove, CA DA - 05/2002 LA - eng N2 -

As part of the High Performance Commercial Building Systems program, LBNL has been working with the City of Oakland to understand the ongoing performance of the Oakland Administration Buildings. The primary objective of this research is to understand the performance targets and ongoing performance of two buildings that were the subject of a new construction performance contract. Secondary objectives include examining the building performance information systems developed as part of the new construction performance contract and evaluating the role of the energy management and control system (EMCS) as a data acquisition tool to provide recommendations for future new construction projects. We examine the results of the performance contract in detail, and provide additional performance metrics that go beyond what was required in the performance contract. We found that the energy cost intensities (ECI) linked to the project ranged from $1.08/ft2 to $1.44/ft2. Changes in floor area, energy costs, rate schedules, and energy use complicate the evaluation of the performance because of the lack of tracking of underlying data and assumptions. Overall, Oakland has two large office buildings with relatively low-energy use (50 kBtu/ft2-yr site electricity and gas use). We compare this energy-use intensity with a number of related benchmarks. Additional end-use, HVAC performance, and diagnostics data are discussed.

PP - Pacific Grove, CA PY - 2002 T2 - 2002 ACEEE Summer Study on Energy Efficiency in Buildings T3 - 2002 ACEEE Summer Study on Energy Efficiency in Buildings TI - From Design Through Operations-Results from New Construction Performance Contract and Beyond ER -