TY - CPAPER KW - Energy Markets and Policy Department KW - Energy Analysis and Environmental Impacts Division AU - Ryan M Firestone AU - Michael Stadler AU - Chris Marnay AB -
On-site cogeneration of heat and electricity, thermal and electrical storage, and curtailing/rescheduling demand options are often cost-effective to commercial and industrial sites. This collection of equipment and responsive consumption can be viewed as an integrated energy system (IES). The IES can best meet the site's cost or environmental objectives when controlled in a coordinated manner. However, continuously determining this optimal IES dispatch is beyond the expectations for operators of smaller systems. A new algorithm is proposed in this paper to approximately solve the real-time dispatch optimization problem for a generic IES containing an on-site cogeneration system subject to random outages, limited curtailment opportunities, an intermittent renewable electricity source, and thermal storage. An example demonstrates how this algorithm can be used in simulation to estimate the value of IES components.
BT - 4th International IEEE Conference on Industrial Informatics, Singapore, August 16-18, 2006 C2 - LBNL-60591 CY - Singapore DA - 06/2006 N2 -On-site cogeneration of heat and electricity, thermal and electrical storage, and curtailing/rescheduling demand options are often cost-effective to commercial and industrial sites. This collection of equipment and responsive consumption can be viewed as an integrated energy system (IES). The IES can best meet the site's cost or environmental objectives when controlled in a coordinated manner. However, continuously determining this optimal IES dispatch is beyond the expectations for operators of smaller systems. A new algorithm is proposed in this paper to approximately solve the real-time dispatch optimization problem for a generic IES containing an on-site cogeneration system subject to random outages, limited curtailment opportunities, an intermittent renewable electricity source, and thermal storage. An example demonstrates how this algorithm can be used in simulation to estimate the value of IES components.
PB - LBNL PP - Singapore PY - 2006 T2 - 4th International IEEE Conference on Industrial Informatics, Singapore, August 16-18, 2006 T3 - 4th International IEEE Conference on Industrial Informatics, Singapore, August 16-18, 2006 TI - Integrated Energy System Dispatch Optimization ER -